Reconstruction of Local Sites Chrudim - Pardubická

Details:

Location: Chrudim
When: 2020 / 2020
Description: 

GAS PIPELINES
PE d 315 RC SDR 17 with sheating [m], protector 36
PE d 225 SDR 17 [m] - as a protection
- as a protection against a push-through
PE d 160 RC SDR 17 [m] 316
PE d 160 SDR 17 [m] - as a protection. 2,8
PE d 90 RC SDR 17 [m] 8
gas pipelines in total [m] 324
CONNECTORS:
PE d 63 RC SDR 11 [m] with sheating 3 m
PE d 50 RC SDR 11 [m] wiht sheating including the vertical parts 69,5 m
PE d 90 SDR 11 [m] - as a protection 40 m
Recently transported or replaced HUP OPZ 9 ks.

 

Full price excluding VAT      5.310.000,- Kč

 

Galerie: