Reconstruction of Local Sites Hradec Králové - Zemědělská

Details:

Location: Hradec Králové
When: 2019 / 2019
Description: 

New medium-pressure gas pipeline PE 100 dn 400 length cca 634 m

New medium-pressure gas pipeline PE 100 dn 315 length cca 5 m

New medium-pressure gas pipeline PE 100 dn 160 length cca 36 m

New medium-pressure gas pipeline PE 100 dn 63 length cca 3 m

New medium-pressure gas pipeline connectors PE 100 with a protective surface dn 32 - 8 pieces, length 43m

 

Full price excluding VAT            9.790.000, -Kč