Reconstruction of Medium-pressure Gas Pipelines and Regulation Stations Pardubice - Závod

Details:

Location: Pardubice
When: 2020 / 2020
Description: 

SO_01_rekonstrukce_mistni_site
• Branch “A” Dělnická Street
A new medium-pressure PE gas pipeline dn 225, total length cca 79,0 m.
• Branch “B” Dělnická Street
A new medium-pressure PE gas pipeline dn 110, total length cca 86,0 m.
• Branch “C” Dělnická Street
A new medium-pressure PE gas pipeline dn 160, total length cca 90,0 m.
Reconstruction of 5 connectors, 2 connectors reconnected..

 

Full price excluding VAT          5.890.000,- Kč