Reconstruction of Local Sites Pardubice - Štrossova +1

Details:

Location: Pardubice
When: 2020 / 2020
Description: 

Gas pipeline:
PE D225, length 108 m,
PE D110, length 112 m,
PE D63, length 65 m,
TOTAL 285 m.
Connectors:
PE D 63, length 38 m,
PE D 50, length 33 m,
PE D 50, length with orange-and-yellow protective layer thk 3 mm 6 m.

 

Full price excluding VAT 3.730.000,- Kč