Reconstruction of Local Sites Přelouč - Žižkova II.

Details:

Location: Přelouč
When: 2020 / 2020
Description: 

HIGH-PRESSURE GAS PIPELINE:
D 225, SDR 17.6; PE100, ČSN EN 1555 - 254 m,
D 160, SDR 17.6; PE100, ČSN EN 1555 - 2 m,
D 110, SDR 17.6; PE100, ČSN EN 1555 - 138 m,
D 63, SDR 11; PE100, ČSN EN 1555 - 13 m,
Total length of reconstructed gas pipelines 407 m.
CONNECTORS:
Reconstruction: 14 pcs,
1 pc cancelled.
 

Full price excluding VAT           5.735.000,- Kč
 

Galerie: